Crown Apartments
Back to Projects

Crown Apartments

Bedminster, Bristol TBC

Sector

Residential

Service

Mechanical & Electrical

Size

26 Apartments

Duration

11 Months

Crown Apartments

Project Overview

Design and build of Electrical, Mechanical and Public Health installations to a new build apartment scheme in Bedminster, Bristol.

ORB Mechanical and Electrical was appointed to design and build the Electrical, Mechanical and Public Health installations to this new Build apartment scheme in Bedminster, Bristol.

Project Specifics

The scope of works for this project includes:

Gas boiler fed district heating system serving the heating and hot water to all apartments
Above ground drainage
Smoke ventilation systems
Dry risers
Fire alarm
Door entry and Access control systems
Power
lighting and lighting control
CCTV
IRS/TV/Satellite system

"Very professional and technically competent job from the entire team at ORB. They professionally delivered all aspects of M&E specifications as required and we would willingly recommend ORB without a doubt. ORB's integrity, initiative and intelligence has been built into this project. Thank you for all your hard work!"

Jim Peglar

Ops Manager

Have a Similar Project?

Get in touch to discuss your requirements and receive a competitive quote.

Contact Us